Process:
divided into methanol, olefin, public engineering 3 centers
Methanol center equipment adopts washing absorption + boiler incineration process
The olefin center equipment adopts liquid nitrogen cryogenic + boiler incineration process
The public engineering center adopts alkaline washing + biological method + advanced oxidation + activated carbon adsorption process
Achieved results:
The wastewater treatment scale of 100,000 m³/h, covered area of 14,000 square meters, electric movable PVDF membrane cover, electric stainless steel cover plate for the first time in the country.